REACT: Why is firmware download job reporting "Run halted because time limit expired. Percent complete: 95.00"?

Environment/Versions
REACT version 4.200 and later.
Answer
There is a bug with REACT download program in which firmware download program will report the message when start a firmware download job with the expiration time set to NONE or by using the "Run now" button. After the job completes the REPORTS tab shows the final status as "Run halted because time limit expired.  Percent complete:  95.00".    When it should say "Run completed".

You can workaround this by scheduling the job with expiration other than "NONE" for the job (ie 1 to 24hrs), the final status comes back as "Run completed".

Currently there is no plan to correct this defect.

Product : REACT