Umetrix Data: While out field testing, how can I ensure that my results are being uploaded successfully to Umetrix Database?

Answer

A summary of project progress is provided to assist in monitoring ongoing Umetrix Data tests. This page acts as a dashboard to monitor devices currently under test to ensure that results are uploaded to the database successfully and in a timely manner.

To monitor project progress:

  • On the main project screen, click the View Progress link.

The Project Progress page refreshes every ten seconds to provide updated status during testing. Results are color-coded to indicate the activity level for each device:

  • Green – The IMEI is active. The database has received uploads from this device within the last 2.5 minutes.
  • Yellow / Brown – The IMEI is active but it has been between 2.5 and 5 minutes since the database received the last upload.
  • Red – The IMEI is active but it has been between 5 and 10 minutes since the database received the last upload.
  • No coloring – The IMEI is inactive. It has been more than 10 minutes since this device’s last upload to the database.

Information regarding project IMEIs is contained in two tables:

  • Project Progress Matrix – Basic information for each handset in the project.
    • Time since the last upload
    • Total number of uploads – 1 upload for each test cycle, or iterations of all tasks in a Test-Set
    • Total number of results – the total number of results for all tasks in the Test-Set
    • Result success rate
  • IMEI and Test Set Combinations – Statistics for every handset / Test-Set combination.
    • Time of last upload
    • Time since last upload
    • Result success rate