Printer FriendlyEmail Article Link

Avalanche: Which 1Gig ports must be connected for a back port test on SPT-C1?

Environment/Versions
  • Avalanche Commander
  • version 4.45
Answer
  • For running back to back test, you must connect port 1 to port 3 or port 2 to port 4. 
  • Note: the 1G ports on C1 are auto detect that can take crossover or straight through cables. 

Product : Avalanche