Printer FriendlyEmail Article Link

iTest: How to run failed test cases again in a Master test-case.

Environment/Versions
  •  iTest 
Answer
  • Add Summarize step at the end of the master test case. 
  • Use analysis rules to fetch the failed child test cases from the summarize step response and store in a variable.[use response map if needed]
  • Pass this variable to a procedure containing run step as an argument as shown in screen shot.

             

 


Product : Velocity Portfolio,Velocity iTest