Printer FriendlyEmail Article Link

Spirent TestCenter : Why are DCBX Feature Results and DCBX Priority Flow Control Results not working as expected?

Environment/Versions
  • Spirent TestCenter
  • Switching - LLDP/DCBX
Answer

Check for TLV Mismatches and subscribe to relevant results.
DUT was operating with IEEE 802.1 - Priority-based Flow Control Configuration TLV but TestCenter was configured with DCBX TLV SUb-Type 2


Product : Spirent TestCenter,Switching,Spirent TestCenter,LLDP/DCBX